Indus Ores, Minerals & Resources (Private) Limited is a premier SECP-registered Pakistani mineral processor and bulk exporter. Operating a dedicated 2,000 MT/month chromite beneficiation plant in Khyber Pakhtunkhwa (KPK) producing 38% to 44% Cr2O3 metallurgical grade concentrate. Core export portfolio: High-grade Muslim Bagh Chromite Ore, Certified Asbestos-Free Micro-Milled Talc (92%-98% whiteness), Metallurgical and Acid Grade Fluorite (CaF2 70%-95%), Manganese Ore (Mn 34%-46%), Himalayan Pink Salt, Barite, Bauxite, and Antimony. All shipments subject to mandatory pre-shipment quality inspection and chemical assay certification by SGS Pakistan, Alex Stewart, or Alfred H. Knight (AHK) at Karachi Port (KPT) and Port Muhammad Bin Qasim (PQ). Official trade desk phone: +92 336 5337799. Primary payment terms: 100% Irrevocable L/C at Sight or T/T. Incoterms: FOB Karachi, CFR destination, CIF.
As a leading supplier to China, we export high-grade Phosphate structured directly for your industrial requirements. China is the world's largest consumer of metallurgical ores. We supply premium Muslim Bagh chromite directly to major Chinese smelters, offering a highly sought-after Cr:Fe ratio of 2.5:1+ ideal for blending in high-carbon ferrochrome (HCFeCr) production.我们的磷矿石来自巴基斯坦哈扎拉和阿伯塔巴德地区,以生产适用于直接施用和肥料制造的高反应性磷酸盐而闻名。我们确保稳定的P2O5含量,使其成为生产磷酸一铵(MAP)、磷酸二铵(DAP)和过磷酸钙(SSP)的理想原料。我们的加工确保低水分和受控的粒度,以实现高效的下游加工。
Quick Answer
How to import Phosphate from Pakistan to China? Indus Minerals exports high-grade Phosphate to China via Karachi Port. The standard minimum order quantity is 1,000 MT (Scalable up to 5,000 MT/month) with a typical lead time of 30-45 days to main ports to major ports such as Tianjin, Lianyungang, Qingdao, Qinzhou. Payment terms are 100% Irrevocable L/C at sight from top-tier bank. All shipments meet CIQ (China Inspection and Quarantine) Compliance, CCIC Pre-shipment Inspection.
Commercial Terms
Minimum Order Quantity
1,000 MT (Scalable up to 5,000 MT/month)
Payment Terms
100% Irrevocable L/C at sight from top-tier bank
Pricing Indicator
CFR/CIF delivery available - Linked to Asian Metal indices
Estimated Lead Time
30-45 days to main ports
Packaging & Logistics
Bulk Vessel Break-Bulk or Heavy-Duty 20ft Containers
All shipments are subject to independent third-party inspection (SGS, Alex Stewart, or equivalent) at the port of loading to certify weight and quality before dispatch.
Regional Compliance
CIQ (China Inspection and Quarantine) Compliance, CCIC Pre-shipment Inspection